One of the major environmental problems that developing countries are facing is improper solid waste disposal and management strategies. Solid waste has been a major environmental issue. A major portion of the solid waste comes from school, home, offices, market, farms and other public places.In this some of the garbage, refuse, sludge, trash, and rubbish are biodegradable e.g., paper products, food droppings, as well as vegetation like grass and twigs, and others are not biodegradable and they include metals, aluminium cans, plastics, broken computers, and car parts. As they do not decay easily, they pile up in landfills and refuse dumps and these bring great harm to the water, land, and people around it.
India produces 277.1 million tonnes of solid waste every year.Which is likely to touch 387.8 million tonnes in 2030, and 543.3 million tonnes by 2050.
Country wise per person waste generation per day
By 2050, however, India’s figure is projected to increase by 900 gm every day. The waste management hierarchy consists of six stages:
Now Reduction of solid waste is very challenging as the population is growing day by day and this cannot be achieved without strict govt. policies Reuse is depend completely on supply of that product, its cost and interest of public. Unless and until the substitute is available and one has purchasing power, we will not hesitate to throw the old one. Now rest two are achievable trough proper waste management and industrial processes.In these two RECOVERY is very important, as without recovery recycling is not possible. In the solid waste we find below materials:
Note: The ratio may different from place to place
We at Zeus EngitechPvt. Ltd. has made sure to provide the most suitable equipment for managing and recycling the waste at every stage. We have designed manufactured, supplied, erected and commissioned complete systems upto a capacity of 300 tons per day. Theseplants have been satisfactorily performing to the rated capacity from the date of commissioning. The performance of the plant during commercial production, since last 4 years. We give after sales service, by way of timely supply of spares & deputation of our expert design and service engineer, as and when called for, to help, in the operation & maintenance of the plant.
Coal mining in India began in 1774 in the Raniganj Coalfield along the Western bank of the Damodar River. As on 31 March... Continue
India is the third largest Salt producer in the World after China and the USA with Global annual production being about ... Continue
India today is the third largest producer of nitrogenous fertilizers in the world only behind China and USA. At present,... Continue
Coal has very significant value among all the minerals and organic materials. Coal is dug from the coal mines that have ... Continue
In today’s world the demand of fuel is rising day by day and the resources are very limited. Now people are thinki... Continue
There are two methods in practice for handling bulk cargo.• Mechanical Handling – using grab buckets, crane... Continue